MILITARY

Tactical Planning Calculator

Mission timeline · Force allocation · Logistics · Risk · Operational planning

timeline force mgt

Mission parameters

soldiers
units
km
km/h
Average tactical movement speed
hr
Time spent at objective
score
score
score
score

Tactical planning

  • T_m = D / V movement time (hr)
  • T_total = T_m + T_on + T_m + 0.25×T_m total mission time
  • F_req = f(P, T, W, L) force requirement
  • Risk = weighted factors operational risk
Total mission time 10.5 hr
Risk level HIGH
Force required 135 soldiers
Mission timeline Move Action Extract
Move Action Extract 0h Total
Duration: 10.5 hr
Force allocation
Assault 70 %
Support 20 %
Reserve 10 %
Logistics vehicles 3 vehicles
Risk factor breakdown mitigation
Threat
8.0
Terrain
4.0
Weather
6.0
Logistics
3.0
Overall risk: HIGH Mitigation: Reduced speed, extra intel